Universal Access To All Knowledge
Home Donate | Store | Blog | FAQ | Jobs | Volunteer Positions | Contact | Bios | Forums | Projects | Terms, Privacy, & Copyright
Search: Advanced Search
Anonymous User (login or join us)
Upload
Search Results
Results: 1 through 28 of 28 (0.116 secs)
You searched for: creator:"White, Thomas D."
[texts]Minimum Crushed Aggregate Requirements : Final Report - Huang, Haiming
Joint Highway Research Project: FHWA/IN/JHRP-96/23; Project C-36-55J, File No. 2-12-10
Downloads: 62
[texts]Concrete Pavement Crack and Seat Performance and Overlay Design : Final Report - Huang, Haiming
Joint Highway Research Project: FHWA/IN/JHRP-94/12; Project C-36-52P, File No. 6-20-15
Downloads: 135
[texts]Conditions for Stripping Using Accelerated Testing : Final Report - Pan, Changlin
Joint Transportation Research Program: FHWA/IN/JTRP-97/13; Project C-36-55L, File No. 2-12-12
Downloads: 51
[texts]Development of an Overlay Design Procedure for Flexible Pavements in Indiana : Executive Summary - Lindly, Jay K.
Joint Highway Research Project: FHWA/IN/JHRP-87/09-2; Project C-36-55G, File No. 2-12-7
Downloads: 63
[texts]Flexible Pavement Drainage Monitoring, Performance, and Stability : Final Report - Feng, Aiwen
Joint Transportation Research Program: FHWA/IN/JTRP-99/02; Project C-36-15N, File No. 6-9-14
Downloads: 90
[texts]Asphalt Mix Design and Performance : Final Report - Badaruddin, Shakor Ramat Bin
Joint Highway Research Project: FHWA/IN/JHRP-94/03; Project C-36-55I, File No. 2-12-9
Downloads: 335
[texts]Locating the Drainage Layer for Flexible Pavements : Final Report - Hassan, Hossam Farouk.
Joint Highway Research Project: FHWA/IN/JHRP-96/14; Project C-36-15L, File No. 6-9-12
Downloads: 86
[texts]Construction Specifications for Highway Projects Requiring Horizontal Earth Boring and/or Pipe Jacking Techniques : Executive Summary - Hancher, Donn Edward
Joint Highway Research Project: FHWA/IN/JHRP-89/08-2; Project C-36-672, File No. 9-11-26
Downloads: 140
[texts]Guidelines for Permitting Overloads, Part I Effect of Overloaded Vehicles on the Indiana Highway Network : Final Report - Zaghloul, Sameh Mohamed
Joint Highway Research Project: FHWA/IN/JHRP-93/05; Project C-36-73L, File No. 3-4-12
Downloads: 423
[texts]Development of an Overlay Design Procedure for Flexible Pavements in Indiana : Final Report - Lindly, Jay K.
Joint Highway Research Project: FHWA/IN/JHRP-87/09-1; Project C-36-55G, File No. 2-12-7
Downloads: 131
[texts]Layer Coefficients in Terms of Performance and Mixture Characteristics: Final Report - Coree, Brian David
Joint Highway Research Project: FHWA/IN/JHRP-88/13; Project C-36-55H, File No. 2-12-88
Downloads: 74
[texts]Second Phase Study of Change in In-Service Asphalt, Vol. 1 of 2 - Main Report : Final Report - Galal, Khaled A.
Joint Transportation Research Program: FHWA/IN/JTRP-99/07-I; Project C-36-55K, File No. 2-12-11
Downloads: 67
[texts]Effect of Fine Aggregate Angularity on Asphalt Mixture Performance : Final Report - Lee, Chih-Jen
Joint Transportation Research Program: FHWA/IN/JTRP-98/20; Project C-36-21H, File No. 2-8-8
Downloads: 92
[texts]Pavement Drainage and Pavement Shoulder Joint Evaluation Numerical Analysis of Infiltration and Drainage in Pavement Systems : Final Report - Espinoza, Reynaldo David
Joint Highway Research Project: FHWA/IN/JHRP-93/02-1; Project C-36-15J, File No. 6-9-10
Downloads: 112
[texts]Sources, Measurements, and Effects of Segregated Hot Mix Asphalt Pavement : Final Report - Williams, Ronald. Christopher
Joint Highway Research Project: FHWA/IN/JHRP-96/16; Project C-36-36MM, File No. 2-4-39
Downloads: 75
[texts]Construction Specifications for Highway Projects Requiring Horizontal Earth Boring and/or Pipe Jacking Techniques : Final Report - Hancher, Donn Edward
Joint Highway Research Project: FHWA/IN/JHRP-89/08-1; Project C-36-672, File No. 9-11-26
Downloads: 178
[texts]Development of Asphaltic Concrete Overlay Design Procedure for Rigid Pavements in Indiana : Executive Summary - Pumphrey, Norman D. (Norman Dean)
Joint Highway Research Project: FHWA/IN/JHRP-89/14-2; Project C-36-55G, File No. 2-12-7
Downloads: 76
[texts]Development of Asphaltic Concrete Overlay Design Procedure for Rigid Pavements in Indiana : Final Report - Pumphrey, Norman D. (Norman Dean)
Joint Highway Research Project: FHWA/IN/JHRP-89/14-1; Project C-36-55C, File No. 2-12-7
Downloads: 581
[texts]Second Phase Study of Change in In-Service Asphalt, Vol. 2 of 2 - Appendices : Final Report - Galal, Khaled A.
Joint Transportation Research Program: FHWA/IN/JTRP-99/07-II; Project C-36-55K, File No. 2-12-11
Downloads: 116
[texts]Pavement Drainage and Pavement-Shoulder Joint Evaluation and Rehabilitation : Final Report - Ahmed, Zubair
Joint Highway Research Project: FHWA/IN/JHRP-93/02-2; Project C-36-15J, File No. 6-9-10
Downloads: 1,212
[texts]Rated Axle Load Enhancement (RALE) System : Summary Report - Lee, Chih-Jen; Sutton, Charles D.; White, Thomas D.
Joint Transportation Research Program: FHWA/IN/JTRP-97/07; Project C-36-37GG, File No. 5-8-33
Downloads: 66
[texts]Three Dimensional Finite Element Program for Pavement Analysis, Volume II: Appendix 2 : Final Report - Nilaward, Tatsaba
Joint Highway Research Project: FHWA/IN/JHRP-96/21-2; Project C-36-67FF, File No. 5-8-32
Downloads: 116
[texts]An Accelerated Testing System to Determine Percent Crushed Aggregate Requirements in Bituminous Mixtures : Interim Report - White, Thomas D.
Joint Highway Research Project: FHWA/IN/JHRP-90/08; Project C-36-55J, File No. 2-12-10
Downloads: 89
[texts]Three Dimensional Finite Element Program for Pavement Analysis, Volume I: Introduction and Appendix 1 : Final Report - Nilaward, Tatsaba
Joint Highway Research Project: FHWA/IN/JHRP-96/21-1; Project C-36-67FF, File No. 5-8-32
Downloads: 134
[texts]Three Dimensional Finite Element Program for Pavement Analysis, Volume III: Appendix 3 : Final Report - Nilaward, Tatsaba
Joint Highway Research Project: FHWA/IN/JHRP-96/21-3; Project C-36-67FF, File No. 5-8-32
Downloads: 122
[texts]Subgrade Resilient Modulus for Pavement Design and Evaluation : Final Report - Lee, Woojin
Joint Highway Research Project: FHWA/IN/JHRP-92/23-1; Project C-36-52N, File No. 6-20-14
Downloads: 514
[texts]Assessment of Routine Maintenance Needs and Optimal Use of Maintenance Funds: An Estimation of Service Life and Cost of Routine Maintenance Activities : Interim Report - Executive Summary - Feighan, Kieran John
Joint Highway Research Project: FHWA/IN/JHRP-86/09; Project C-36-63K, File No. 9-7-11
Downloads: 49
[texts]Subgrade Resilient Modulus for Pavement Design and Evaluation : Implementation Report - Lee, Woojin
Joint Highway Research Project: FHWA/IN/JHRP-92/23-2; Project C-36-52N, File No. 6-20-14
Downloads: 102
Advanced search

Group results by:

> Relevance
Mediatype
Collection

Related mediatypes

texts